1. Determination of time standard for a given job using stopwatch time-study.
2. Preparation of flow process chart, operation process chart and man-machine charts
for an existing setup and development of an improved process.
3. Study of existing layout of a workstation with respect to controls and displays and
suggesting improved design from ergonomic viewpoint.
4. To carryout a work sampling study.
5. To conduct process capability study for a machine in the workshop.
6. To design a sampling scheme based on OC curve.
7. To conduct Shewart's experiments on known population
8. Generation of random numbers for system simulation such as facility planning, job
shop scheduling etc.